Skelton says Recovery Act budgets $55 million civil works projects in district
By: Press Office of U.S. Rep. Ike Skelton
Congressman Ike Skelton
WASHINGTON, D.C. (April 28, 2009) — Congressman Ike Skelton (D-Mo.) announced that the U.S. Army Corps of Engineers will release more than $55 million in construction and facility improvement projects to Harry S. Truman Dam and Reservoir, Pomme de Terre Lake, and Stockton Lake and Dam, in Missouri’s Fourth Congressional District. These funds were made available by the American Recovery and Reinvestment Act.
“Harry S Truman Dam and Reservoir, Pomme de Terre Lake, and Stockton Lake and Dam will see work begin on many important maintenance, restoration, and modernization projects. Purchasing emergency response equipment for the Harry S Truman Dam and Reservoir, modernizing recreation facilities at the Pomme de Terre Lake, and completing critical road repairs at the Stockton Lake and Dam are just a few of the projects that will be funded by the Recovery Act,” said Skelton.
“These dollars will create jobs here at home. And, they are also so important to those who use these lakes for recreation and for ensuring the strength and stability of these areas,” said Skelton.
On April 28, the U.S. Army Corps of Engineers announced the details of the construction and improvement projects to Harry S. Truman Dam and Reservoir, Pomme de Terre Lake, and Stockton Lake and Dam. A complete list of the specific projects in Missouri is attached. More information about the funding is available online at www.usace.army.mil/recovery and www.recovery.gov.
_____
Missouri 4th Congressional District: U.S. Rep. Ike Skelton Total Stimulus Funding within the Kansas City District for Missouri: $71,237,000 Total Stimulus Funding within the Kansas City District for 4th District: $55,392,000
Pomme de Terre Lake FY09 Maintenance Contract Labor/Added Mowing, Refuse Collection, Service Contracts: $52,000 FY09 Water Safety Rangers/Safety Brochures: $50,000 FY09 Emergency Communication Equipment: $15,000 FY09 Boundary Maintenance Contract: $25,000 FY09 Document Digitization (PM-P and OD); Contract Scanning of Records: $30,000 FY09 Dam Safety Rock Stockpile: $175,000 FY09 Recreation Equipment: $60,000 FY09 Recreation Facilities: $45,000 FY09 Stilling Basin Repair DSAC III Project: $5,000,000 FY09 Maintenance Temporary Labor: $48,000 FY09 Maintenance Contract Labor: $50,000 FY09 Maintenance Equipment(loader bucket, skid loader, dump truck): $175,000 FY09 GPS Equipment Upgrade: $10,000 FY09 Critical Road Repairs: $1,148,000 FY09 Upgrading Facilities to ensure ADA compliance: $310,000 FY09 Sedimentation Survey: $110,000 TOTAL: $7,303,000
Stockton Lake FY09 Recover Broken Turbine Blade: $75,000 FY09 Maintenance Contract Labor/Added Mowing, Refuse Collection, Service Contracts: $508,000 FY09 Repair Bulkheads: $450,000 FY09 Governor Repair: $1,500,000 FY09 Transformer Replacement: $9,000,000 FY09 Turbine Repair: $17,475,000 FY09 Generator Rewind: $5,000,000 FY09 Water Safety Rangers/Safety Brochures: $50,000 FY09 Cultural Resources Human Remains Investigation: $50,000 FY09 Instrumentation DSAC III IRRM: $150,000 FY09 Emergency Communication Equipment: $15,000 FY09 Hydropower Equipment and Maintenance: $205,000 FY09 Maintenance Equiment; dump truck, backhoe, flatbed, trailer: $160,000 FY09 Habitat Maintenance: $338,000 FY09 Document Digitization (PM-P and OD); Contract Scanning of Records: $30,000 FY09 Inspection/Repair of Hydraulic Steel Structures: $375,000 FY09 Inspection/Repair of Hydraulic Steel Structures: $100,000 FY09 Dam Safety Rock Stockpile/Bedding DSAC III IRRM: $395,000 FY09 Recreation Equipment: $60,000 FY09 Recreation Facilities: $465,000 FY09 Security: $10,000 FY09 Maintenance Contract Labor: $50,000 FY09 GPS Equipment Upgrade: $10,000 FY09 Critical Road Repairs: $2,492,000 FY09 Upgrading Facilities to ensure ADA compliance: $450,000 FY09 Sedimentation Survey: $130,000 TOTAL: $39,543,000
Harry S. Truman Dam & Reservoir FY09 Maintenance Contract Labor/Added Mowing, Refuse Collection, Service Contracts: $335,000 FY09 Water Safety Rangers/Safety Brochures: $75,000 FY09 Emergency Warning and Communication Equipment: $25,000 FY09 Admin Building Energy and General Upgrades: $60,000 FY09 Document Digitization (PM-P and OD); Contract Scanning of Records: $30,000 FY09 Regulatory Office Energy Efficiency Upgrades: $50,000 FY09 Inspection/Repair of Hydraulic Steel Structures: $50,000 FY09 Dam Safety Rock Stockpile: $216,000 FY09 Recreation Equipment: $160,000 FY09 Recreation Facilities: $175,000 FY09 Temporary Maintenance Labor: $40,000 FY09 Maintenance Contract Labor: $75,000 FY09 Maintenance Equipment (Tractor, Backhoe, boat, metal shear): $250,000 FY09 GPS Equipment Upgrade: $10,000 FY09 Critical Road Repairs: $2,665,000 FY09 Hydropower Equipment and Maintenance: $415,000 FY09 Upgrading Facilities to ensure ADA compliance: $450,000 FY09 Sedimentation Survey: $350,000 FY09 Boundary Maintenance: $40,000 FY09 Habitat Maintenance: $25,000 TOTAL: $5,496,000
Congressman Ike Skelton (D-Mo.) serves as Chairman of the House Armed Services Committee. Congressman Skelton’s website is at http://www.house.gov/skelton.